Contacts Links Site map Home Project News Cruises Data People Technological development Instrumentation Calibration/validation operations Image Reports & publications
Site map
FIRST DEPLOYMENT (UNSUCCESSFUL): MAY 2002 DEPLOYMENT

The modified version of the buoy has been deployed on site with all its instrumentation the 16 of May 2002. Some images of the deployment are shown in Fig. 10. Soon after this deployment, the non-nominal behavior of the buoy was identified, in particular an abnormal lowering of the buoy. When a clear analysis of what was happening was possible, and when the weather became workable, a ship was sent on site. It was unfortunately too late and the full system was lost. The cause of the sunk is a leakage of the main floatation, the exact reason of which being unknown (probably some defect of the construction).

Pictures taken during and just after the deployment of the buoy in May of 2002.

Back to top

Home | Project overview | News | Cruises | Data | People | Tech. dev. | Instrumentation | Calibr./valid. oper. | Image gallery | Reports & pubs
© Copyright 2005 Laboratoire d'Océanographie de Villefranche